WET-255: Plumbing/Equipment New 20' x 40' in-ground concrete pool with sundeck, autocover, full chemical automation, and a spa. Dig Corral Rebar Shoot Plumbing/Equipment Tile/Coping Plaster Final Back Pool Stubbed out plumbing Before the pool was shot, we stubbed out all the plumbing. Connected the stubs After the sheeting is removed, we begin to connect all the plumbing stubs. Skimmers and Returns Returns and run alongside the skimmers piping. Plumbing to Pool house We plumbed all the piping into the pool house. Plumbing backfilled After the plumbing is pressure tested, we carefully backfill all the plumbing. Plumbing backfilled All around the pool the plumbing is covered and tamped. Spa Plumbing the spa Because this spa is raised, plumbing is attached to the inside of the framed wall. Spa plumbing complete Plumbing is one big loop for equalized pressure for returns and jets. Jet air supply This pipe stubbed into the skimmer is the air supply line for the jet. Plumbing to the pool house All the elecrical conduit and piping is plumbed to the pool house.
Before the pool was shot, we stubbed out all the plumbing.
After the sheeting is removed, we begin to connect all the plumbing stubs.
Returns and run alongside the skimmers piping.
We plumbed all the piping into the pool house.
After the plumbing is pressure tested, we carefully backfill all the plumbing.
All around the pool the plumbing is covered and tamped.
Because this spa is raised, plumbing is attached to the inside of the framed wall.
Plumbing is one big loop for equalized pressure for returns and jets.
This pipe stubbed into the skimmer is the air supply line for the jet.
All the elecrical conduit and piping is plumbed to the pool house.