WET-255: Dig New 20' x 40' in-ground concrete pool with sundeck, autocover, full chemical automation, and a spa. Dig Corral Rebar Shoot Plumbing/Equipment Tile/Coping Plaster Final Back Site prior to our digging Ah, the smell of a new pool about to be born! Shallow end Some dirt left in for the sundeck/stairs. Deep end This is a fairly deep pool at 7' deep. Tamping of sundeck/stairs The soil beneath the stairs is compacted to ensure a stable base. Rock in the deep end Under the pool is six inches of pea-gravel to ensure good drainage below the structure. Pool completely dug out and rocked We are ready to start building the corral. The concrete footings are for the pool equipment house.
Ah, the smell of a new pool about to be born!
Some dirt left in for the sundeck/stairs.
This is a fairly deep pool at 7' deep.
The soil beneath the stairs is compacted to ensure a stable base.
Under the pool is six inches of pea-gravel to ensure good drainage below the structure.
We are ready to start building the corral. The concrete footings are for the pool equipment house.