PHI-247: Plumbing/Equipment New 18' X 36' in-ground vinyl pool Dig Walls Plumbing/Equipment Floor Liner Final Back Connecting pipes to panels Panels come with cut outs for returns and skimmers. Lights are cut in with holesaw. Plumbing ran to equipment pad Pipe and conduit is plumbed to the dirt and follows the trench to the equipment pad. Main drain PVC flex hose is slipped under a panel for the main drain plumbing. Pressure test All pipes are pressure tested to ensure all fittings and pipe were plumbed properly. Equipment pad Main drain and skimmers are plumbed into the pump. Water flows through the filter then heater back through the pool return lines.
Panels come with cut outs for returns and skimmers. Lights are cut in with holesaw.
Pipe and conduit is plumbed to the dirt and follows the trench to the equipment pad.
PVC flex hose is slipped under a panel for the main drain plumbing.
All pipes are pressure tested to ensure all fittings and pipe were plumbed properly.
Main drain and skimmers are plumbed into the pump. Water flows through the filter then heater back through the pool return lines.