PHI-247: Dig New 18' X 36' in-ground vinyl pool Dig Walls Plumbing/Equipment Floor Liner Final Back Starting to dig We staked the pool layout and began to dig. Shaping the floor We place a string line where the wall panels are going to sit and then proceed to dig the deep end of the pool, finely tuning it with shovels. Finishing the floor While the hopper (the deepest part of the pool) is being shaped, the excavator finishes digging the shallow end. Dig is complete After the dig the homeowner requested the snow fence for their dogs.
We staked the pool layout and began to dig.
We place a string line where the wall panels are going to sit and then proceed to dig the deep end of the pool, finely tuning it with shovels.
While the hopper (the deepest part of the pool) is being shaped, the excavator finishes digging the shallow end.
After the dig the homeowner requested the snow fence for their dogs.