LAR-256: Plumbing/Equipment New 10' x 60' in-ground vinyl lap pool Dig Walls Floor Liner Plumbing/Equipment Final Back Plumbing and conduit All the plumbing and conduit is installed into the wall panel fixtures and ran to the equipment pad. Plumbing trench We dig a trench for all the plumbing to run to the pad. Pressure test We stub all our pipe up and pressure test to ensure everything is in working order. Pipe connected to equipment Once the pressure test is complete, we can begin to plumb the piping to the equipment on the pad. Equipment is plumbed Main drain and skimmers are plumbed into pump. Piping continues through the filter and heater then back to the pool. This pool is ready to circulate water.
All the plumbing and conduit is installed into the wall panel fixtures and ran to the equipment pad.
We dig a trench for all the plumbing to run to the pad.
We stub all our pipe up and pressure test to ensure everything is in working order.
Once the pressure test is complete, we can begin to plumb the piping to the equipment on the pad.
Main drain and skimmers are plumbed into pump. Piping continues through the filter and heater then back to the pool. This pool is ready to circulate water.