LAR-256: Dig New 10' x 60' in-ground vinyl lap pool Dig Walls Floor Liner Plumbing/Equipment Final Back Pool layout and dig We pulled measurements and laid out the pool. Excavator dug the depth and the bobcat moved dirt out of the way until backfill. Dig complete After the dig we tamp the floor and over dig (where the wall panels sit). We did not have to dig down very far due to the huge slope of the homeowner's backyard.
We pulled measurements and laid out the pool. Excavator dug the depth and the bobcat moved dirt out of the way until backfill.
After the dig we tamp the floor and over dig (where the wall panels sit). We did not have to dig down very far due to the huge slope of the homeowner's backyard.