KLA-253: Plumbing/Equipment New 20' x 40' in-ground pool with autocover Dig Walls Floor Liner Plumbing/Equipment Final Back Equipment pad Equipment pad is framed up and ready for concrete to be poured. Plumbing run to pad We dug a trench from the pool to the pad for all of our plumbing. Plumbing tested We pressured test all our lines after everything is plumbed to ensure all lines are in working order. Equipment plumbed in The skimmer and main drain is plumbed into the pump, through the filter then heater, and back to the returns. Pool is ready to circulate.
Equipment pad is framed up and ready for concrete to be poured.
We dug a trench from the pool to the pad for all of our plumbing.
We pressured test all our lines after everything is plumbed to ensure all lines are in working order.
The skimmer and main drain is plumbed into the pump, through the filter then heater, and back to the returns. Pool is ready to circulate.