With the Pool framed up and main drains plumbed and installed, the walls shown here are mostly rebarred (walls first, then floor).
A clean site gives way to a clean shot of the pool with walls and floors rebarred. All that's left are the stairs.
Guys worked so fast we didn't have a final shot of the spa when rebar was complete. Pic shows spa plumbing complete and rebar started.