Rebar on this job was unique.
Not only did the rebar need to be welded to the helical piers...
And each pier turned into a micro footing.
This pool had two layers of rebar. Although it is hard to see half of the bent rebar is about 4 inches above the other half.
After backfilling up to the bottom of the floor, we dug the main drains and surounded them with...you guessed it more rebar.
Not only were there two layers of rebar welded to piers sunk 50' down, it was a 10" grid instead of a 12" grid! This pool ain't never going nowhere. Fo-sho!