The site is cleared, leveled, and ready to start digging.
The "little" trench on the left is where the plumbing will run back to the equipment room.
We found an electrical run that had to be moved.
This site required a 24" overdig. So we did that and filled it in with clean compactable sand.
We still put in our stone base, but because this site required it it was 12" instead of the typical 6".
Before leaving the site we put up safety fencing to keep people from accidently falling in the new hole.