Not much to look at. Here is the equipment room when we first got a hold of it.
Step one: core drill out the wall. Step two: unbox the equipment and start laying it out.
The pump with the skimmer and main drain lines plumbed into it.
This wall has an auto-leveler and a chemical controller. NOTE: The state now requires at least a half wall to separate the chlorine and acid.
Here is a closer look at the automation equipment and the 15-gallon acid and chlorine containers.
A finished equipment room is at least as much art as science. Look how pretty that is!