It is nice when the lumber can be brought right into the pool.
The "pins" are laid out and driven into the ground.
Once the pins are in place we nail in the 2x4's that will hold the plywood.
The "top row" is made up of 2x8's and is where the top of the shotcrete wall will be.
We use the "L-brackets to ensure a strong wall to shoot up against and to make sure the walls are plumb.
Final step is putting the sheeting on. Now the corral is ready for rebar & rough in plumbing.