High pressure canon shoots concrete on to the walls.
Floor is over half complete. Crew also smooths out surrounding area with shovels.
The shoot is finalized. Steps are finished, cover will be placed over the area to help cure the shot-crete. It is November, after all.
As the pool cures, there's plenty still to do. Plumbing being one of them!