Getting close to being able to rebar. Framing walls still needed.
Walls are now framed. Note the skimmers framed, as well. Sneak peak of rebar started.
Main drains are plumbed and passed the pressure test of 10 psi for 10 minutes. You can also see the corral in the background and the space left for plumbing outside the pool.