Before plastering we acid wash the pool. This gives the plaster an etched surface to adhere to.
One of the hardest, longest days in the cycle of pool building and also one of the most rewarding once complete.
Final plastering on steps. Walls and floor first.
It was snowing that day. The heat from the pool area caused some leaking from the cover above. Plastic was used to mitigate the problem.