Stairs chipped and bench brown coated. Also, first row of tile is complete on the steps side.
Tile around skimmer is complete.
Where water depths change, tile is installed. Bench and stairs shown here.
Corner tile installed and grouted.
Coping is complete around the perimeter of the pool and slopes away from the pool for water mitigation. Relief cuts are complete, allowing the concrete to better absorb weight, pressure and settling.
Chipping and brown coating complete. Picture taken from step side showing perimeter tile and bench (transition) tile.