The shoot is complete on the walls and floor. Steps and browncoat (for tile) remains.
No surprise in MN. Snow in February.
Steps are framed and rebarred.
Steps turned out beautifully.
With the cold weather, the shotcrete is covered in thermal blankets to help cure correctly.
Brown coated ready for tile, and boards up around the perimeter for coping.