We fill the pool next day after we plaster. The plaster needs to be under water to cure properly.
Water chemistry is vital to proper curing of the plaster. We test and balance the pool water and get the equipment circulating the water.
We are installing the mesh winter cover to ensure that minimal dirt and debris fall into the water, staining the new plaster.
We drill holes for in the deck for the anchors holding the mesh cover straps.
Everything is installed and ready to enjoy.