We laid out stakes for the dig site to guide the excavator.
As we get closer to our depth for the deepend, we use a laser to guide the excavator.
Once the deepend is excavated, we gradually the ramp, checking depths with laser.
The stakes are where the inside of our pool wall. We excavate a 4' over-dig in order to frame our walls.
After the pool is excavated, the next step is to set a string line for depths, os the bulldozer knows where he needs to put rock.
Bulldozer lays 6" of rock for pool base.
Excavation done and rock in. Ready to begin framing.