Before we shoot the concrete for the pool and spa, we pressure test all the plumbing to ensure all pipes are working properly.
We pressure test every line for five mintues with ten pounds of pressure.
Spa was shot and now we formed the outside stairs to be poured.
We poured the stairs and were able to take forms off the next day.