Before the final inspection we install the rest of the pool and spa equipment
We installed the ADA lift. The battery pack is mounted in the equipment room.
The ladder and both railings for the pool are installed.
Everything is installed in and around the pool. Pool equipment is circulating and water is balanced.
The spa railing for the stairs and the transfer rail are installed.
Spa water is circulating and balanced.
We verify everything that we did not install (lights were installed by electrician) are in working order.
Time to enjoy the pool and spa!