We started shooting the walls and cutting them in and then moved to pouring the floor.
As one guy pours the concrete, two other guys screed the concrete.
Here is the pool walls and floor completely shot.
The shell of the pool is shot but we will have to come back to frame and pour the stairs.
The spa was shot and cut in.