Corners are in along with the plumblines.
Walls next!
Length ends of the pool are next.
Ends are left as well as framing around the skimmers.
You can see the framing around the skimmers and a good view of the over dig which provides for plumbing run on the outside of the pool. Main drains will NOT be that high. (:
Corral looks good, sneak peak at the rebar job with walls complete and a good start to the floor.