Beginning to rebar the pool walls, we layout rebar canes every foot and run lengths every foot from the top.
After the walls are rebarred, we tie in the floor with L bends.
All rebar is tied and common bricks are used to lift the rebar off the ground.
Because this is a raised spa, the plumbing will be run in the spa walls and before rebar is placed.
The spa walls are done first. The floor is then tied into the walls using L bends.
The last step in rebarring a spa is the bench.